The Future of Demolition
October 15, 2009 by Janet7 · 26 Comments
Introduction
The definition of the word ‘demolish’ is deliberate and controlled collapse of a structure. In the late 1970′s Fred Dibnah became the most famous steeplejack in Britain when his work on demolishing tall chimneys without the need for explosives was shown on Television. Fred was an specialist on repairing tall chimneys, so when it came to taking them down he knew just how to do it. He would cut an alcove at the base of the chimney, and then place wooden props to support the structure. By carefully positioning the props, the chimney would collapse in the right direction when the wood was set alight and burned away. Once he was nearly crushed when he miscalculated demonstrating how dangerous demolition work is.
The actual word to demolish only came into being in 1570, and was used after that to mean the deliberate taking down or destroying of a building or structure. Although in fact the process of demolition in some form or other has been occurring for thousands of years. Buildings have been destroyed either by natural disturbances of the Earth’s crust or during battles or attacks on villages for as long as there have been structures. The remaining ruins would be removed and rebuilt or used for other buildings nearby and must be the first examples of recycling.
Preserving the past – preparing the future.
To preserve Britain’s history of agriculture the land between built up areas of the villages and towns is protected from development of urban sprawl. This land is known as Green Belt and is preserved for farming which is vital to the continuing economy of the country. By containing the Green Belt, urban areas are squeezed to provide housing, so developers have to be more creative to find suitable sites.
Britain is a country with a very dense population per square mile. The amount of land available for development is limited compared to other countries. Therefore there is always a high demand for space on which to build. Taking down old and unused buildings and replacing them with new is one way to counteract this shortage.
Land that may be disused industrial and commercial sites, but could be contaminated with hazardous waste or pollution, are called Brownfield sites. Once the land has been cleaned up they are potentially valuable for redevelopment. Both Glasgow and South Wales created gardens out of old industrial sites and put in Shopping centres to attract visitors.
Greyfield sites are distinct from Brownfield sites in that they do not have the environmental concerns of toxic waste. The term greyfield comes from the large areas of asphalt which had once been car parks of commercial urban properties. Their value is in the fact that the infrastructure such as roads, electricity, water, sewage, and gas is already in place. These urban areas are underutilised or abandoned and are valuable because require very little remedial work to be exploited. Cities such as Leeds and Manchester have had a massive programme of converting the old warehouses or factories into apartments, shops and restaurants, retaining the original shell and refurbishing the interior into modern accommodation.
The Demolition process
Building and office demolition must have careful consideration given to the following points.
• The construction and size of the building.
• What items are valuable for re-use?
• How will the old site be re-used?
• How is the waste to be disposed of?
• Electricity water, sewage and gas mains.
Hydraulic excavators and bulldozers can be used to undermine the walls at the base, so that the structure will topple; at the same time controlling the manner and direction of the fall. Safety issues are paramount, and clean-up strategies are also taken into account when choosing how the building will be demolished.
Traditional Demolition
Once all the services were disconnected, the men and machinery would go in and just knock down the walls. The whole structure would collapse and the resulting debris would be piled onto lorries and disposed of in landfill sites. Concrete foundation would be broken up by pneumatic drills and the site would be cleared of rubbish. However today demolition practices are subject to strict planning, safety and monitoring regulations and are highly controlled by the local authority.
Deconstruction and Recycling
The new approach to demolishing buildings is known as deconstruction – a green approach. Landfill sites are in short supply so the aim when demolishing a building is to reduce the amount of waste remaining.
Small structures such as two or three storey houses can be dismantled quite easily. The work may be a painstaking task of dismantling by hand – brick by brick – or beam by beam but by going carefully costly materials are preserved for re-use. The value of deconstruction is that 90% or more of waste is saved from going into landfill sites and reclaimed materials can be re-used and recycled for future buildings. The farmer opposite my house sold his barns in the farm yard for housing; when the builder demolished the barns he cleaned up the bricks and reused them for the wall around the farmhouse thus retaining the character of the farm.
Modern techniques and machinery allows demolition companies to efficiently segregate waste types on or off-site. Construction materials are recycled and re-used whenever possible in the new structure making considerable savings in project costs as well as being good for the environment.
Concrete can now be rapidly broken up with a new machine called a guillotine.Demand increases daily of 6f2 recycled material as it provides a viable alternative to disposing of the demolished building remnants to landfill. It can also be used on site as a sub-base for any new buildings.
Copper pipes, lead, roof tiles or slates, floor tiles, wiring and doors, and wood panelling are valuable artifacts that are saved for recycling and re-use. Many specialist firms sell reclaimed old or antique building items in most towns and cities.
Tall Buildings
Tower blocks and chimneys are the type of tall buildings that may need to be demolished. The demolition of tall buildings necessitates specialist techniques. The tallest building to be demolished lawfully was in 1967/8 of the Singer Building in New York. The collapse of the World Trade Centre after the 9/11 attack in 2001 demonstrates the terrible devastation that occurs if the demolition is uncontrolled and haphazard.
In the demolishing of tall buildings and large structures a wrecking ball on a crane can be used, but is rarely practiced because the swinging ball is rather uncontrollable. The proximity of other buildings is a determining factor which prevents the use of explosives to implode a tall structure. So ‘High Reach’ demolition excavators are used where other methods are not suitable to demolish the top part of a tall building. Once it is down to a manageable height demolition can continue in the usual way. The various methods of demolishing tall buildings are by implosion using explosives, controlled collapse and piecemeal. To control the dust produced in demolition, water hoses and spray equipment are sometimes used and then it is called a wet demolition.
Explosions
The use of explosives in demolition is very specialist work and getting it wrong would be disastrous. If for instance there is atmospheric pressure from low cloud above the implosion site, the shockwave may spread outwards instead of upwards causing the wave of energy and sound to break windows. If an implosion is not prepared correctly the danger may be damage to surrounding buildings where flying debris may cause injury to spectators.
For many people when they think about demolition they may have in mind the use of explosives in the dramatic collapse of a tall building. This process is actually called implosion using explosives. Implosion is essential for dense urban areas as it brings down a tall building so that the surrounding environment is damaged as little as possible. The collapse takes only seconds for the building to drop into its own footprint.
Because of the dangers of working with explosives they will only be used when other methods are too costly or impractical. Where there is a partial collapse of a building and there are still primed explosives that failed to go off, workers are in great danger because the remaining structure is highly unstable. At the same time the demolition has to continue to secure the safety of the site.
Health and Safety
The work of demolition is a much more technical and complicated process than most people would appreciate. The job is highly dangerous and requires experienced and skilled operators to carry out the work. It is essential that personnel working in the industry are thoroughly trained. Health and safety awareness is crucial in demolition services so it is advisable for operatives to have gained a Certificate of Competence in Demolition to ensure safety for both workers and public alike. All demolition work is regulated by the Construction, Design and Management Regulations.
Sequence of Demolition
An incorrect sequence of dismantling will result in accidental collapse of a building because the stability of any structure is reliant on the interdependence of its component parts. Think of a house of cards and what happens if one of the supporting cards is removed.
There is a strict sequence of events before any demolition can take place. Councils throughout the country will have their own specific list for planning approval in their area, but a typical order would be as follows:-
• Provision of Information
Information must be provided about the construction of the structure to be demolished. Details of its previous use and the appropriate demolition methods to be used, including disposal of hazardous substances, have to be submitted by the demolition company.
• Survey of Demolition
A thorough survey of the site to identify any structural problems, as well as risks associated with hazardous or flammable substances, will need to be discussed in detail with the authorities. (E.g. A disused garage where petrol has been stored is a potential fire hazard so preventative measures will need to be taken).
• Preferred and Safe Method of Work
A reputable demolition company will be able to select the appropriate method of disposal showing the outline dismantling process. Planning is essential for vigilant monitoring. The authorities will require a detailed statement of the safety procedures to used, and all parties involved need to agree the methods before any demolition can take place.
• Preparation and Planning
Issues such as asbestos abatement, rodent baiting, dealing with hazardous substances, disconnecting utilities, and making safe any electric, gas or other services have to be shown in the planning stage. There is a lot of preparation to be done before even starting work on demolishing the building itself.
• Protection of the Public
Safety cannot be compromised so where there are heavily populated areas around the demolition site the protection of the public is paramount. Any health hazards will need to be assessed and temporary services arranged, and people affected will have to be informed.
Prior to commencement of dismantling taking place, your demolition company should demonstrate they have adhered to a similar process as the above in order to gain demolition planning permission.
Conclusion
The aim in demolition is to eliminate an unwanted building as safely and quickly as possible and in our modern environment efforts are made to recycle or re-use most of the old material. This is not a new idea although the word itself is relatively modern. On the borders between England and Scotland after the Romans left, a large part of Hadrian’s Wall was hauled away and use was made of the beautifully dressed stone to construct the new buildings in the towns and villages nearby and some are still standing today.
Demolition work by its nature is a very dangerous business and demolishing any building is a complex and skilled process. Next time you see demolition work occurring on a building give a thought to the people who work in a dangerous situation daily and how much is involved in the meticulous planning, regulations compliance, care and skill that goes on to carrying out the project to clear the way for our future.
What Happens As Your Dog Gets Older
September 7, 2009 by Janet7 · 32 Comments
Q. Is there any special training tool that should be used for the older dog?
A. No. A chain collar and six-foot web leash are applicable for all training sessions with a normal healthy dog, regardless of age.
Q. Why don’t dogs get cavities except in rare instances?
A. It is speculated that the enamel surface of the dog’s teeth is harder and more impenetrable to pathogenesis than that of humans. Another factor could be that the dog is presumed to not to have amylase in the saliva as humans do; so while human starch-digestion begins in the mouth, the dog’s starch-digestion starts further down the intestinal tract. Some research has since discovered salivary enzymes.
Q. Do dogs have to go out for walks more often as they get older?
A. Yes, but for different reasons. If we are dealing with a normal, healthy dog, he can get along on the frequency he is used to. However, if you have an older dog that is beginning to show arthritis problems (dog symptoms), it is a good idea to get him moving more often during the day. The older dog can also tend to get lazy, and circulation is improved with moderate walks.
Q. Is a dog’s bladder weaker at eight or nine years old?
A. Most of the time, what is interpreted as a weak bladder is actually a bladder infection or an ensuing kidney problem. Urinary bladder infections can be common, regardless of age, and kidney disease is very pronounced in the older dog. Two of the most common problems in the older dog are bad heart and bad kidneys.
Q. If the older dog begins to urinate in the house for apparently no reason, after being housebroken for many years, would you assume this to be a medical problem rather than spite-work?
A. Yes, most definitely. You must first eliminate any dog health problems before you chastise your dog for disobedience. Medically speaking, if he is urinating in the house, this is most likely a bladder problem. If he is drinking more water and also urinating in the house, it could more likely be a kidney problem.
Q. Is exercise bad for the older dog?
A. No. Exercise is very good for a dog unless there are definite contraindications, such as heart problems. All exercise should be within reason. Jumping hurdles is exercise that the older dog should not be asked to do, but walking provides healthful exercise for all dogs of any age.
Q. Do older dogs need a different diet?
A. Yes. They should have less total protein but a higher quality protein. Different age dogs do require different diets. Younger dogs need a high concentration of protein, middle-aged dogs can thrive on the protein that exists in the average good-quality dog food, and older dogs need lesser amounts of higher-quality protein. Excess protein produces more nitrogenous wastes, which means more work for the kidneys. Dogs with kidney problems could be put on prescription dog food, or small amounts of high-quality protein, such as in eggs, yogurt, tofu, ricotta, farmer cheese, cottage cheese, and hard mild cheeses, together with a lot of raw, grated vegetables. Kidney problems require low protein. Heart problems require low salt. Very often the two maladies go hand in hand. (Source: Dog Health Questions)
